Guam Construction Update
Motorists are advised to drive cautiously through the construction zones, observe all posted speed limit and construction signs, and carefully heed flaggers (when present). Alternate routes and/or adjusting drive times when feasible are encouraged. Route 14B (Ypao Road) Reconstruction and Widening (Route 14 to Carmen Memorial Dr), Phase 1 Cliffside – Tamuning From Monday, 1/6/25 to Friday, 1/10/25 between 9:00 AM and 4:00 PM, motorists are advised that the contractor will continue shoulder work along Route 14B and on the sidewalk. During this time, expect minimal lane shifts and intermittent lane closures. Route 14 Resurfacing from Route 1 to Route 14B – Tamuning From Monday, 1/6/25 to Friday, 1/10/25 between 9:00 AM and 4:00 PM, motorists are advised that the contractor will continue shoulder work along Route 14 (Chalan San Antonio). During this time, expect minimal lane shifts and intermittent lane closures. Route 2 Striping – Agat The DPW HMC crew will be striping Route 2 in Agat during the week. Work will occur between 7:00 AM and 3:30 PM. The DPW asks motorists to please proceed with caution and remain alert for traffic control signs and work crews. Route 4 Striping – Talofofo The DPW HMC crew will be striping Route 4 in Talofofo during the week. Work will occur between 7:00 AM and 3:30 PM. The DPW asks motorists to please proceed with caution and remain alert for traffic control signs and work crews. Islandwide Village Street Pavement Resurfacing – Agat Village The DPW HMC crew will resume milling and paving Calle de Los Marteres St in Agat. Work will occur between 7:30 AM and 4:00 PM. The DPW asks motorists and residents to please proceed with caution and remain alert for traffic control signs and work crews. |